|
Coal
Construction Materials
Copper
Gold
Industrial Minerals
Iron Ore
Lead / Zinc
Nickel
Platinum / Palladium
Silver
|
Las Brisas Project, Venezuela
PAH has concluded the resource and reserve portions of the Feasibility Study and is currently working on updating portions of the study for Gold Reserve's Las Brisas gold-copper project. PAH has developed the geologic model and resource estimate for the project and is in the process of reviewing the mine plan, production schedule, and reserve estimate. As part of this effort, PAH has developed the mine capital and operating cost estimates.
Bulyanhulu Project, Tanzania
PAH conducted a complete review of the Bulyanhulu gold-silver-copper deposit in northwestern Tanzania. The audit, conducted on behalf of the Senior Lender Group to the project, included a detailed review of the geology, reserve estimate, mine plans, metallurgical test work, process methods and facilities, infrastructure, logistics, environmental matters, construction monitoring and complete review.
Berezitovy Gold Project, Siberia
PAH conducted a Technical and Economic Assessment of the High River Gold / Berezitovy Gold Project in Siberia at the request of the European Bank for Reconstruction and Development (EBRD). As part of the study, PAH reviewed resources, reserves, mine plans, processing, infrastructure, and cash flow models. The assessment will constitute the basis of a full diligence review, with an emphasis on the larger issues that may alter the risk profile of the project to EBRD.
- Africa
- Ghana, Afema, Environmental Review
- Ghana, Ntotorosa, Due Diligence
- Ghana, Teberebie, Resource Model Review
- Ghana, Teberebie, Technical Consultant's Report
- Ghana, Teberebie, Audit and Verification of Reserves
- Ghana, Teberebie, Environmental Review
- Ghana, Wassa, Independent Drilling Program
- Ghana, Wassa, Conceptual Plan and Economic Evaluation
- Ghana, Wassa, Feasibility Study
- Ghana, Wassa, Due Diligence
- Mali, Tabakoto, Technical Audit
- Zambia, Kansanshi, Process Review
- Australia
- Western Australia, Normandy Poseidon Properties, Preliminary Evaluation
- Northern Territories, Mt. Todd, Due Diligence
- Central America
- Costa Rica, Bellavista, Fatal Flaw Analysis
- Costa Rica, Bellavista, Technical and Economic Audit
- Costa Rica, Bellavista, Due Diligence Review
- Domincan Republic, Cerro de Maimon, Feasibility
- Dominican Republic, Pueblo Viejo Sulfide Project, Prefeasibility Study
- Nicaragua, Cerro Mojon, Due Diligence Review
- Eastern Europe and Russia
- Amurr Oblast, Pokrovskoye Gold, Due Dilligence
- Kazakhstan, Pustynnoye, Drill Hole Data Evaluation
- Kazakhstan, Pustynnoye, Conceptual Mine Plan and Cost Estimate
- Kazakhstan, Pustynnoye, Balkhash Mining Company Review
- Kyrghystan, Jerooy, Independent Audit of Sampling and Analysis
- Kyrghystan, Jerooy, Technical Audit
- Kyrghystan, Kuru Tegerek, Geologic Modeling and Resource Estimate
- Magaden Oblast, Kubaka Gold, Independent Engineer
- North America
- Canada, Fenlon, Resource Estimate and Scoping Study
- Canada, Doyon, Independent Engineers Review
- Canada, Meadow Bank, Financial Review
- Canada, Mouska, Independent Engineers Review
- Canada, Colomac, Reserve Estimate Analysis
- Canada, Sleeping Giant, Independent Engineers Review
- Canada, Farley Lake, Reserve Review
- Canada, Lake Shore, Due Diligence Review
- Canada, Red Mountain, Due Diligence Review
- USA, Goldstrike, Reserve Audits
- USA, Mineral Ridge, Due Diligence
- Mexico, Magistral, Reserve Study
- Mexico, Salamandra, Preliminary Assessment and Scoping Study
- Mexico, Magistral, Preliminary Property Evaluation
- Mexico, Magistral, Feasibility Resource Modeling and Mine Planning
- Mexico, Ocampo, Geology and Exploration Potential Analysis
- Mexico, Cerro San Pedro, Grade Modeling Procedure Review
- Mexico, Cerro San Pedro, Prefeasibility Study Support
- Mexico, Cerro San Pedro, Prefeasibility Study
- Mexico, Magistral del Oro, Due Diligence Review
- Mexico, La Fortuna, Project Review
- Mexico, El Baztan, Due Diligence Review
- Mexico, Lluvia Del Oro, Property Review Mexico, Encantada, Valuation
- South America
- Argentina, Esquel Gold Project, Prefeasibility Study, Resource Estimate
- Argentina, Esquel Gold Project, Metallurgical Test Work
- Argentina, Nuequen River, Technical Review
- Argentina, Cerro Mayal, Technical Review and Placer Gold Evaluation
- Bolivia, Amayapampa, Feasibility Preliminary Review
- Bolivia, Capa Circa, Feasibility Preliminary Review
- Bolivia, Huanuni, Ore Reserve Certification
- Bolivia, Colquiri, Ore Reserve Certification
- Bolivia, San Juan, Ore Reserve Certification
- Bolivia, San Vicinte, Ore Reserve Certification
- Bolivia, Wila Kkota, Project Review
- Brazil, Chapada, Ore Resources and Reserves Estimate
- Chile, Pimenton, Due Diligence
- Chile, Pascua Gold, Reserve Audit
- Chile, Quebrada Colorada, Technical Audit
- Chile, Refugio, Development Plan Assessment and Kriging Model Validation
- Chile, Chili Peppers, Preliminary Review
- Chile, Chili Peppers, Reserve Analysis
- Chile, Nevada, Technical Audit
- Chile, Nevada, Reserve Estimate and Conceptual Mine Plan
- Chile, Nevada, Reserves Estimation, Mine Plan, and Feasibility Study
- Chile, Nevada, Grade Modeling and Resource Assessment
- Chile, Pullalli, Operating and Capital Cost Estimate
- Chile, El Penon, Quarterly Review
- Ecuador, Yacuambi River, Concession Review
- French Guiana, Camp Caiman, Environmental Regulation Analysis
- French Guiana, Camp Caiman, Scoping Study and Cost Estimation
- Guyana, Omai, Independent Engineering Review and Assessment
- Venezuela, Las Brisas, Resource and Reserve Portions of Feasibility Study
|